OJSC «KAZANORGSINTEZ» Print

(Bisphenol A production plant)

Scope of delivery: Complete power transformer substations 2KTPP–1600 kVA,2KTPP–1000 kVA, MCC of withdrawable modules design.

Equipment information: «CHETA» LLC based on technical design assignment (engineered in cooperation with TOYO Engineering corporation) carried out a works on initial data movement to General Designer OAO «Samaraneftechimproekt». Also «CHETA» participated in development of work documentation. After equipment delivery in a very short time with the participation of «CHETA» engineers have been carried out pre-commissioning works and factory had been brought into operation in time (in 2007).

During operation period «CHETA» didn’t received any complaint.