ZAO NORTGAZ Print

(Supply of equipment, supervision, installation and commissioning works. Severo- Urengoyskoye field).

Facility: Gas condensate reservoirs construction at the Eastern Dome of the North- Urengoyskoye field for the period of pilot and field testing. GTU 2.

Equipment: MCC, LV package.

Facility: Severo-Urengoyskoye field. Pumping station of foam fire extinguishing. Condensate de-ethanization unit.

Equipment: automatic capacitor units, uninterruptible power supply systems, DC systems, uninterruptible power supply units, LVDBs with frequency controllers, power panels. Delivery - July 2014.

Facility: Pumping unit for external unstable condensate pumping of GTU-2, Severo- Urengoyskoye gas-condensate field.

Equipment: modular building of DB-TS-6/0,4 kV. Delivery - February 2014.

Facility: Condensate De-ethanization Unit at Severo-Urengoyskoye field. Condensate de-ethanization unit.

Equipment: packaged transformer substantion with emergency power supply 2PTS- 2500C-6/0.4-U3. Delivery - June 2014.

Facility: Condensate de-ethanization unit of North-Urengoyskoye field. Foam firefighting pumping station.

Equipment: packaged transformer substantion with emergency power supply 2PTS- 630C-6/0.4-U3. Delivery - May 2014.

Facility: Condensate de-ethanization unit of North-Urengoyskoye field. Foam firefighting pumping station.

Equipment: 6 kV DB. Delivery - June 2014.

Facility: booster compressor station of GTU-2 of the Eastern dome of the North- Urengoyskoye field. Equipment: 2PTS-1000/6/0.4 unit with LVDBs (8473-22.1 - EM.S). Delivery - September 2016.

2PTS-2500/6/0.4 with LV DBs for gas air cooling unit. Delivery - September 2016.

Facility: maintenance base at GTU-1 of the Western dome of the North-Urengoyskoye field.

Equipment: outdoor packaged transformer substantion 2PTS-630-6/0,4. Delivery - June 2014.

During manufacturing technical solutions of LLC CHETA for 6 kV switchgear on the basis of RSN-10 cubicles with vacuum circuit breakers of VEP-12 series were applied.

In addition to manufacturing and delivery, specialists of LLC CHETA supervised installation and commissioning of the equipment supplied. The equipment has been put into operation.

 